DEMOLITION CASE STUDIES

See how we’ve delivered safe, efficient demolition projects across the South East.

Rabbit handles full demolition services for domestic, commercial and industrial sites. From garages and outbuildings to more complex structures, we plan each job with care, work safely throughout and keep disruption to a minimum.

Demolition of Former Concrete-Framed Structure, Brighton

Rabbit Waste Management was appointed by McHugh Civils to safely demolish a part-built, concrete-framed structure located at the busy junction of Buckingham Avenue, Buckingham Street and Gloucester Road in Brighton. The project demanded careful planning, controlled methods of work and close coordination with local authorities due to its central location and the presence of sensitive infrastructure on site.

Read in FULL

Project Requirements

The structure sat within a tight urban footprint, meaning pedestrian and traffic management were critical. A full road closure of Buckingham Street was required to provide safe access for plant and operatives throughout the demolition phase.

A UKPN substation on the site added another layer of complexity. To safeguard this asset, we installed a full crash-deck platform wrapped in monoflex sheeting. This provided robust physical protection while helping control dust and debris. Scaffolding was erected to the Buckingham Road and Upper Gloucester Road elevations to create a secure working boundary and protect neighbouring properties.

Demolition Approach

Mechanical demolition was carried out using a high-reach excavator fitted with a hydraulic pulveriser, allowing controlled removal of the structure from top down. A water cannon was used throughout to manage dust emissions and maintain air quality.

Sections of slab containing live cabling were identified early and left undisturbed. The remaining slab and foundations were removed in a staged sequence, with all arisings transported to licensed facilities for compliant disposal and recycling.

Neighbour and Environmental Management

Given the location, maintaining positive relations with surrounding residents and businesses was central to the programme. We worked closely with the Environmental Protection Officer at Brighton and Hove City Council to minimise noise, vibration and dust, adapting working hours and methods where appropriate.

Programme

Time on site: 12 weeks
Works were completed to programme, with all safety, environmental and quality requirements met.

Outcome

The site was handed back cleared, safe and ready for the next phase of development. Through careful planning, specialist protection measures and close cooperation with local authorities, Rabbit delivered a complex demolition scheme in a constrained urban environment with minimal disruption.

Get a quote for your demolition needs →

demolition of four former retail units in TOOTING, SOUTH WEST LONDON

In mid-2023, Rabbit Demolition successfully carried out the demolition of four former retail units located at 190–194 Mitcham Road, Tooting, in South West London.

The work was undertaken on behalf of Rocco Homes as part of a wider redevelopment plan to construct 22 luxury residential apartments along with a ground floor commercial unit.

Read in FULL

Project Overview

In mid-2023, Rabbit Demolition successfully carried out the demolition of four former retail units located at 190–194 Mitcham Road, Tooting, in South West London.

The work was undertaken on behalf of Rocco Homes as part of a wider redevelopment plan to construct 22 luxury residential apartments along with a ground floor commercial unit.

Challenges and Considerations

This project involved several site-specific and logistical challenges:

  • Busy Location: The property was situated on a well-trafficked street in Tooting, requiring careful coordination to minimise disruption to the local area.
  • Access and Safety: Scaffolding was erected around the front, side and rear elevations of the building to provide secure access and egress for workers and equipment.
  • Urban Environment: Working within a dense urban setting required strict adherence to health, safety and environmental regulations, as well as close cooperation with neighbouring businesses and residents.

Outcomes and Goals

The objective of the project was to complete the full demolition and site clearance of the existing structures, enabling the client to proceed with redevelopment. Rabbit Demolition delivered the project efficiently, meeting all safety and timeline requirements and leaving the site ready for construction.

Project Impact

“We can highly recommend Rabbit Demolition for their outstanding demolition service. Their team is not only easy to work with but also remarkably diligent, ensuring a smooth and efficient process at the beginning of our housing development projects.”

Rocco Homes

Get a quote for your demolition needs →

Clearing the way for future redevelopment in Sutton, Surrey

This project entailed the demolition of a detached residential property, including the excavation of a swimming pool, along with the removal of associated slabs and foundations. A key aspect was the dismantling of a garage situated at the front of the site. This had to be completed before any demolition work on the residential property could begin, in order to create proper access and exit routes to the rest of the site for future redevelopment.

Read in FULL

Challenges and Considerations

One of the primary challenges was managing the site clearance while adhering to stringent safety and environmental regulations. Given the proximity of residential neighbours, adherence to noise and dust control measures was a top priority.
Additionally, the project required robust tree protection measures to preserve existing trees on the site in order to meet environmental guidelines and maintain the area’s aesthetic value after the demolition. Our team meticulously planned and executed all demolition activities with careful consideration of these environmental and community factors.

Environmental and community impact:

The initial step was the careful dismantling of the garage to create the required access to the main site. This task demanded precision to avoid damage to surrounding structures and ensure a safe working environment.

We also implemented advanced noise and dust control techniques, including water sprays and sound barriers to minimise the impact on neighbouring properties. Tree protection measures included the use of barriers and protective coverings to shield the trees from damage caused by debris and heavy machinery.

Efficient waste management practices were a cornerstone of the demolition process. Materials were meticulously sorted for recycling and disposal to reduce the overall environmental footprint of the project.

The final outcome:

The completion of the demolition project marked a significant milestone in the preparation of the site for future redevelopment.

Our team’s dedication to efficient property demolition, proactive implementation of noise and dust control measures, and meticulous tree protection steps earned positive feedback from both clients and residents.

“We highly recommend Rabbit Demolition for their outstanding demolition service. Their team is not only easy to work with, but also remarkably diligent, ensuring a smooth and efficient start to our housing development projects.”

– Greg Hoare – Developer of Rocco Homes

Get a quote for your demolition needs →

Revitalising Surbiton’s Urban Landscape

Rocco Homes, a leading name in property development, embarked on a transformative journey to rejuvenate Surbiton’s urban landscape. Their vision for the revival of 64-68 Brighton Road led them to partner with Rabbit Demolition for the demolition of the former Jewsons Merchants premises.

Read in FULL

Challenges and Considerations

The project posed unique challenges due to its prime location along a busy main road flanked by businesses and residential dwellings. However, Rabbit Demolition’s expertise shone through as they meticulously navigated these complexities.

Key features and techniques:

A standout feature of the project was Rabbit Demolition’s thorough approach to protecting neighbouring properties. Recognising the importance of minimising disruption and preserving community harmony, they chose to demolish one shop on the premises by hand, a painstaking method to ensure that surrounding properties remained unscathed, underscoring Rabbit Demolition’s commitment to responsible demolition practices.

The final outcome:

Despite the challenges presented by the project’s location, Rabbit Demolition achieved the primary goal of clearing the site, paving the way for future redevelopment. The successful clearance of 64-68 Brighton Roadd marks a significant milestone in Rocco Homes’ journey toward urban rejuvenation.

Partnering with Rabbit Demolition guarantees not only efficient and professional demolition services but also a steadfast dedication to integrity and community welfare.

Rabbit Demolition is an established and expert demolition company with the ability to handle demolition projects of all sizes, incorporating all elements of the removal and clearing processes which surround unwanted buildings and construction sites.

Get a quote for your demolition needs →

Environmental and materials management in Worthing

Rabbit Demolition was selected by luxury apartment developer Roffey Homes for a pivotal demolition project in Worthing, West Sussex, involving the demolition of a two-storey building, previously used as nurses’ accommodation.

The objective of this demolition was to clear the site for the development of a new four-storey block comprising 30 apartments. Given the building’s former use and its location in a residential area, the demolition required careful planning and execution. Our team employed a strategic approach, ensuring that the demolition was conducted safely, efficiently and with minimal disruption to the surrounding community.

Read in FULL

Challenges and Considerations

  • Soft-Stripping and Demolition with Root Protection

A key challenge in the demolition project was managing the soft-stripping and subsequent demolition while taking into account the root protection area around existing trees. Preserving these trees and their root systems was crucial to maintaining the ecological balance and aesthetic value of the site. The team employed careful methods to ensure that the demolition activities did not adversely affect these protected areas.

  • Crushing Concrete and Hardcore for Reuse

Another important aspect of the project was the handling of concrete and hardcore materials. After the demolition, these materials were crushed and retained on-site. This process was part of a sustainable approach to demolition, allowing these materials to be repurposed in the development of the new property, thereby reducing waste and the need for new resources.

Environmental and Community Impact

The demolition project was marked by a strong commitment to environmental preservation and community welfare.

  • Tree Root Protection

A significant environmental consideration was the protection of the root area around existing trees on the site. Special measures were implemented to ensure that these roots were not disturbed during the demolition process, preserving the natural landscape and contributing to the ecological balance of the area.

  • Sustainable Materials Management

In line with sustainable practices, the concrete and hardcore resulting from the demolition were crushed and retained on-site. This material will be repurposed in the construction of the new property development, significantly reducing waste and the need for new construction materials. This approach not only benefits the environment by minimising waste but also serves the community by contributing to the sustainable development of the area.

Client Testimonials

“Having relied on Rabbit Demolition for many years, we recently engaged their services for demolition and clearance of a site in Worthing in preparation for the construction of new-build apartments.  The experience was seamless from start to finish.  Rabbit Demolition as always proved to be easy to work with, displaying a helpful and local approach that truly sets them apart.

They not only completed the project within the agreed timeframe but also demonstrated a high level of professionalism throughout.  I would happily recommend Rabbit Demolition to others seeking demolition services.”

Simon Snow – Project Manager, Roffey Homes

Get a quote for your demolition needs →

Extensive site clearance & demolition IN CAMBERWELL, LONDON

Rabbit Demolition was engaged by Rocco Homes for a significant project located at 32 Love Walk in the vibrant area of Camberwell, Greater London, entailing the site clearance and demolition of a residential property.

A unique aspect of this project was the condition of the property and its grounds. The house and its surrounding area were laden with rubbish and various items left behind by the previous owner. Additionally, the garden area was completely overgrown, presenting further challenges for the clearance and demolition process.

Read in FULL

Our team undertook the task of meticulously clearing the site, removing all rubbish and unwanted items to prepare for the demolition of the house. This comprehensive clearance process was crucial for the safe and efficient demolition of the structure.

Challenges and Considerations

  • Access Issues Due to Accumulated Rubbish

The demolition project presented a significant initial challenge due to the extensive amount of rubbish accumulated both inside the house and in the garden. This excess waste created access difficulties, necessitating a comprehensive approach to site clearance before any demolition work could begin. The team faced the task of meticulously clearing a large volume of detritus to ensure safe and unobstructed access to all areas of the property.

Client Testimonial

“We can highly recommend Rabbit Demolition for their outstanding demolition service. Their team is not only easy to work with but also remarkably diligent, ensuring a smooth and efficient process at the beginning of our housing development projects.”

Greg Hoare – Rocco Homes

Get a quote for your demolition needs →

Demolition of Historic PuB IN WORTHING

NewSpace Projects, a prominent entity in construction project management, engaged Rabbit Demolition for a key project in Worthing involving the demolition of the former Wheatsheaf pub.

The project’s main objective was to efficiently demolish the existing structure and clear the site, paving the way for future developments. Our team’s approach combined strategic planning with meticulous execution, ensuring the demolition process was conducted safely, effectively, and in an environmentally responsible manner.

Read in FULL

Given the site’s history and location, the demolition required careful consideration of both the physical aspects of the building and the potential impact on the surrounding area. The project was executed with a focus on minimising disruption to the local community, while ensuring all materials and debris were managed in an environmentally conscious way.

Challenges and Considerations

Fire Damage and Structural Instability

A significant challenge in this project was the instability of the structure due to previous fire damage. The fire had compromised the integrity of the building, making it potentially hazardous and unstable. Addressing this issue was critical to ensure the safety of the demolition crew and to prevent any collateral damage to nearby structures and areas.

Environmental and Community Impact

In the demolition project  significant measures were taken to minimise environmental and community impact. NewSpace Projects, understanding the importance of maintaining a safe and unobtrusive work environment, installed perimeter hoarding around the site. This hoarding effectively contained all demolition activities within a defined boundary, ensuring that any potential debris, noise, and dust were limited to the immediate area of the works.

Get a quote for your demolition needs →

Asbestos removal plus soft-strip demolition IN Shoreham, West Sussex

Rabbit Demolition was brought in by property investment and development company Hargreaves Properties Ltd to demolish a two-storey structure on Dolphin Rd in the West Sussex town of Shoreham by Sea.

The demolition process began with a comprehensive asbestos removal phase to a licensed asbestos disposal facility. This crucial step was undertaken with the utmost care and adherence to safety standards, ensuring that all hazardous materials were safely and effectively removed from the site.

Read in FULL

Following the asbestos removal, our team proceeded with an internal soft-strip of the building. This phase involved the careful dismantling of interior elements, preparing the structure for the final stage of demolition.

The mechanical demolition was then conducted by Rabbit Demolition’s skilled operatives. Utilising state-of-the-art equipment and techniques, the team efficiently brought down the remaining structure, ensuring that all demolition activities were performed safely, responsibly, and in accordance with environmental guidelines.

This project highlighted Rabbit Demolition’s expertise in handling complex demolition projects, from hazardous material removal to precise mechanical demolition, aligning with Hargreaves Properties Ltd’s commitment to excellence in property development.

Challenges and Considerations

The demolition project involved several key challenges and considerations that were meticulously managed to ensure the project’s success.

  • Site Set-up and Asbestos Removal

A primary challenge was the safe removal of asbestos, a hazardous material present in the building. Licensed asbestos removal contractors were engaged for this critical task, ensuring that all asbestos was removed in compliance with strict safety and environmental standards. The safe handling and disposal of asbestos were paramount to protect both the demolition team and the surrounding environment.

  • Key Features or Techniques

Soft strip techniques were employed in the main warehouse area before the commencement of structural demolition works. This approach involved the careful removal of non-structural elements within the building, allowing for a more controlled and efficient demolition of the structure itself.

Environmental and Community Impact

Throughout the demolition project, Rabbit Demolition implemented effective measures to minimise environmental and community impact. Debris netting was strategically installed along the boundary fence line to control dust transfer to neighbouring properties. This measure was particularly important in mitigating the impact of demolition activities on local residents and maintaining good community relations.

Additionally, waste management was handled with a strong focus on sustainability. All segregated waste materials were systematically loaded into Rabbit Skips and transported to our dedicated waste transfer facility. This process ensured efficient recycling and disposal, aligning with our commitment to environmental responsibility and reducing the overall ecological footprint of the demolition process.

Get a quote for your demolition needs →

Complex tank removal with unforeseen complications in Croydon, London

Rabbit Demolition was commissioned by property developer Rocco Homes for a significant project on Sanderstead Rd, South Croydon, involving the demolition of a former petrol station, a task requiring meticulous planning and execution due to the complexity of the site.

Read in FULL

A critical component of the project was the removal and decommissioning of the fuel tanks by a qualified tank decommissioning sub-contractor. This process was carried out with the utmost precision and adherence to safety and environmental standards, ensuring no risk to the surrounding community or the environment. Our team’s expertise in handling such sensitive demolition tasks was instrumental in the smooth and successful completion of this project.

This demolition was a vital step in preparing the site for its next phase of development under the guidance of Rocco Homes, further cementing Rabbit Demolition’s reputation as a trusted partner in property development projects.

Challenges and Considerations

The demolition project on Sanderstead Rd, South Croydon, for Rocco Homes presented unexpected challenges, necessitating agile response and strategic replanning.

  • Unexpected Discovery of Additional Fuel Tanks

A significant challenge arose when the team discovered more fuel tanks than had been anticipated. While it was initially believed that the site contained only two fuel tanks, our team on the ground uncovered a total of five. Complicating the situation further, one of these tanks extended beneath the boundary of the neighbouring property. This unforeseen circumstance demanded a swift reassessment of the demolition strategy, particularly regarding the tank removal process.

  • Revised Planning and Execution

Due to the discovery of the additional fuel tanks and their encroachment beyond the property boundary, the original plan for tank removal had to be completely revised. This involved intricate replanning and close liaison with specialists, who provided the necessary expertise for this complex task. The revised approach was critical to ensure the safe and successful decommissioning and removal of all tanks, particularly the one beneath the neighbouring property.

  • Key Features or Techniques

The project highlighted the importance of adaptability and effective communication with specialists in demolition projects. The ability to rapidly re-plan and execute complex tasks in response to unforeseen challenges was pivotal in meeting the project’s goals.

Environmental and Community Impact

The successful removal and decommissioning of all fuel tanks had a significant positive impact on both the environment and the local community. This task, executed with precision and care, ensured that potential environmental hazards were mitigated. The thorough and responsible handling of the tanks eliminated the risk of soil and groundwater contamination, contributing to the long-term safety and wellbeing of the surrounding community. This project underscores Rabbit Demolition’s commitment to environmental stewardship and community safety in all its operations.

Client Testimonial

“We can highly recommend Rabbit Demolition for their outstanding demolition service. Their team is not only easy to work with but also remarkably diligent, ensuring a smooth and efficient process at the beginning of our housing development projects.”

Greg Hoare – Developer of Rocco Homes

 

Get a quote for your demolition needs →

Critical emergency demolition in Chatham, Kent

Rabbit Demolition undertook a critical emergency demolition project at the Lordswood Industrial Estate for chartered accountancy firm Robinson & Co Ltd following a serious fire at their premises, which also impacted an adjacent warehouse.

This project exemplified Rabbit Demolition’s rapid response capabilities and expertise in managing and executing emergency demolition operations under critical circumstances.

Read in FULL

The project’s main focus was to conduct immediate and safe demolition works, starting with emergency propping to secure the structurally compromised buildings. The scope of work extended to the thorough clearance of all internal structures, including demountable components, mezzanine floors and various equipment from a number of units affected by the fire.

Challenges and Considerations

The emergency demolition project for Robinson & Co Ltd presented unique challenges, necessitating a strategic and safety-focused approach due to the urgency and complexity of the situation.

Emergency Propping for Structural Safety

A critical challenge in this project was ensuring the structural safety of the fire-damaged buildings. The immediate requirement was to implement emergency propping works, a task demanding precise engineering and quick action to stabilise the compromised structures and prevent further deterioration or potential collapse. Our team’s expertise in emergency response was crucial in swiftly erecting support structures to ensure the safety of the demolition crew and the prevention of additional damage to surrounding areas.

Comprehensive Removal and Clearance

The removal and clearance of all fire-damaged structures was a hugely complex task, given the extent of the damage and the need to carefully dismantle and remove fire-compromised materials. The project required meticulous planning and execution to ensure that all affected structures were safely demolished and cleared, while minimising the risk of any secondary damage during the process.

Environmental and Community Impact

Rabbit Demolition prioritised environmentally responsible practices in the emergency demolition at Lordswood Industrial Estate. Our team ensured the meticulous removal and appropriate disposal of all waste, significantly reducing the project’s impact on the environment.

Get a quote for your demolition needs →

Eco and community-friendly demolition in Sussex

Rabbit Demolition was selected by Westbrooke Developments / Roffey Homes, renowned developers of luxury apartments, for a key project at the Sussex County Cricket Ground. The project involved the demolition of the former Sussex Cricketer Pub, a domestic dwelling and a wooden building on the grounds.

A significant aspect of this project was the environmentally conscious handling of demolition waste.

Read in FULL

Our team meticulously crushed all waste concrete and hardcore, repurposing these materials for use in the new development, a sustainable approach that not only aided in waste reduction but also contributed to the eco-friendliness of the redevelopment project.

Additionally, we ensured the thorough removal of all other waste materials and the complete clearance of the site, preparing it for the next phase of development. This project showcased Rabbit Demolition’s ability to efficiently manage and execute demolition works while adhering to sustainable practices and preparing the groundwork for future luxury developments.

Challenges and Considerations

The demolition project at Sussex County Cricket Ground, undertaken for the development of luxury apartments, presented specific challenges that required careful planning and execution.

Safe Demolition Using Scaffolding
Extensive scaffolding was erected around the demolition sites to ensure safety throughout the demolition process. The use of scaffolding not only ensured the safety of our demolition crew but also protected the integrity of the surrounding areas during the demolition work.

CCTV Survey of Drainage System
In line with the client’s instructions, we arranged a comprehensive CCTV survey of the site’s drainage system to identify any potential issues that could impact the demolition and subsequent construction phases. By proactively addressing these considerations, we ensured that the infrastructure of the site was preserved and suitable for the upcoming development.

Environmental and Community Impact

Rabbit Demolition implemented strict noise and dust control measures, recognising the site’s close proximity to residential areas. These measures were essential to minimise disruption to the local community and maintain a harmonious relationship with nearby residents. Additionally, the project included specific measures for tree and associated tree root protection, ensuring that the natural landscape was preserved and protected throughout the demolition process. This approach underlined our commitment to environmental care and community consideration in every aspect of our work.

Get a quote for your demolition needs →

Underground Tank Decommissioning and Site Clearance in Hove, East Sussex

Rabbit Demolition was entrusted with a vital project by Rocco Homes, a prominent name in property development. The project involved the meticulous decommissioning and removal of underground tanks at a former Texaco Garage site on Kingsway in Hove, East Sussex.

The comprehensive scope of work included the demolition of all existing buildings and the complete clearance of the site. This preparatory work was a crucial step in paving the way for the development of an eight-storey residential property.

Read in FULL

Challenges and Considerations

The Kingsway project presented unique challenges, primarily due to the site’s history as a fuel station. The presence of underground fuel tanks necessitated a careful and methodical approach to ensure safety and compliance with environmental regulations.

Decommissioning of Fuel Tanks
One of the primary challenges was the decommissioning of the former fuel tanks, a process requiring specialised expertise and precision. Rabbit Demolition brought in specialist contractors with the necessary qualifications, skills and experience to safely decommission the tanks and prevent any contamination of the surrounding environment, as well as ensure the safety of the workers and the local community.

Adherence to Safety and Environmental Standards
Stringent safety protocols and environmental considerations were at the forefront of this project due to the nature of the materials involved and the potential environmental risks. With a commitment to the highest standards of safety and environmental care, the Rabbit Demolition team not only safely decommissioned the fuel tanks but also handled and disposed of all materials removed from the site.

Environmental and Community Impact

Rabbit Demolition, known for its commitment to environmental stewardship and community well-being, ensured that all waste material generated during the demolition process was taken to our Energy Recovery Facility. This conscientious approach aligned with our sustainability goals, ensuring that none of the waste material reached landfill.

Client Testimonial

“We can highly recommend Rabbit Demolition for their outstanding demolition service. Their team is not only easy to work with but also remarkably diligent, ensuring a smooth and efficient process at the beginning of our housing development projects.”

Greg Hoare – Developer of Rocco Homes.

Get a quote for your demolition needs →

Health, Safety and Compliance

All demolition work follows current UK regulations. Rabbit operates with full insurance and trained, competent operatives.

We produce RAMS for every project, maintain clean plant and establish clear traffic management and exclusion zones.